Request an exact quote
Cloud Migration migration path

From Google Cloud to Amazon Web Services

Moving from GCP to AWS for consolidation, commercial terms, or ecosystem reach: service mapping, data transfer tooling, IAM and network rebuild, the egress cost gotcha, and why the savings come from commitments, not the move itself.

Effort
Medium
Est. timeline
~15 wks
Amazon Web Services model
Usage-based (compute + egress)
Open source
No
▶ Model your savings in the interactive calculator

People rarely leave GCP because it is bad. They leave to consolidate onto one cloud, to get better enterprise commercial terms, or because the rest of the org and the third-party ecosystem already live on AWS. Be clear-eyed up front: base compute pricing between the two is close enough that the migration itself will not save you money. Savings come later, from commitments and rightsizing. The move is about leverage and ecosystem, not the sticker price of a VM.

Service mapping

Most of GCP has a clean AWS counterpart. The translation is rarely one-to-one in features, but the shape holds:

GCPAWSNotes
Compute EngineEC2Rebuild instance types; ARM Graviton can cut cost
Cloud StorageS3Closest mapping; storage classes differ
Cloud SQLRDSSame engines (Postgres, MySQL) ease the move
BigQueryRedshift or AthenaAthena over S3 if you want serverless and decoupled storage
GKEEKSKubernetes is portable; the control plane and IAM glue is not
Cloud RunFargate or App RunnerContainer serverless, different cold-start and scaling behavior
Pub/SubSNS plus SQSAWS splits fan-out and queueing into two services

BigQuery is the one to think hardest about. There is no drop-in equivalent. Redshift is a provisioned warehouse with a different cost and tuning model; Athena over S3 (Parquet) is closer to BigQuery’s serverless feel but needs you to manage partitioning and file layout yourself.

Moving the data

Pick the tool by data type and volume.

  • Object data (GCS to S3): AWS DataSync or S3 Storage Transfer-style jobs. For very large or one-time loads, consider Snowball to ship disks rather than fight bandwidth.
  • Databases: AWS Database Migration Service (DMS) does continuous replication with minimal downtime, including heterogeneous moves via the Schema Conversion Tool.
  • Data warehouse: export BigQuery to GCS as Parquet, copy to S3, then load into Redshift or query in place with Athena.
# One-time bulk copy from a GCS bucket to S3, run from a box with both creds
gsutil -m cp -r gs://my-gcp-bucket/data /local/stage
aws s3 cp /local/stage s3://my-aws-bucket/data --recursive
# For ongoing sync, prefer DataSync tasks over scripted gsutil

The egress cost gotcha

This is the line item that ambushes people. GCP charges egress to pull your data out, metered per GB across the whole migration. A multi-hundred-terabyte store can run a serious one-time bill just to leave. Estimate egress before you start, prune dead data first, and weigh Snowball-style physical transfer for the largest datasets. It does not show up in the steady-state comparison, but it is real cash on the way out.

IAM and networking: rebuild, do not port

None of this migrates. You recreate it.

  • GCP IAM bindings and service accounts become AWS IAM roles, policies, and instance profiles. The model differs: AWS leans on roles assumed by resources, so re-architect rather than translate line by line.
  • VPCs, subnets, routes, firewall rules, and load balancers are rebuilt in AWS networking primitives. Treat it as a fresh network design and capture it in Terraform so it is reviewable and repeatable.
  • Secrets move from Secret Manager to AWS Secrets Manager or Parameter Store.

Doing this as code, not console clicks, is what keeps the migration auditable and lets you stand up a staging copy before you cut production over.

Cutover via DNS

Once a workload’s servers, data, and networking are verified on AWS, the switch itself should be boring. Run a final delta sync so the AWS side is current with GCP, freeze writes on the source, and move DNS to the target using Route 53. Validate the application, its integrations, and its cost on AWS before releasing all traffic, then hold a hypercare window with GCP still running as a fallback. Keep the DMS and DataSync tasks alive until cutover is signed off, so a rollback is a DNS change rather than a re-migration. Rehearse the cutover on a low-risk service first, so the sequence and the rollback path are proven before you point production at it.

Where GCP still wins: when not to migrate

Honesty check before you commit the quarter.

  • BigQuery-heavy analytics. If your business runs on BigQuery’s serverless scale and SQL ergonomics, the AWS side is a real downgrade in convenience. This alone has killed many migrations.
  • Deep GKE and Anthos investment. If you have leaned hard into Google’s Kubernetes and service-mesh tooling, the rebuild cost is high.
  • Data gravity and egress. If most of your data and traffic already sit in GCP, the egress bill plus rebuild effort can outweigh any commercial gain.
  • Vertex AI and BigQuery ML pipelines do not have clean lift-and-shift targets.

If GCP is serving you well and the only driver is a modest discount, the migration math often does not close.

How to actually do it

Go workload by workload, not big-bang. Stand up the AWS account structure and networking first, migrate a low-risk stateless service to prove the pipeline, then move stateful systems once the pattern is solid. Keep the GCP resources until the AWS side is verified in production.

What to do next

GCP to AWS is mostly a rebuild, not a lift-and-shift, and the base compute prices are too similar for the move itself to pay for it. Your real savings come afterward from Savings Plans, Reserved Instances, Graviton, and rightsizing, while your real one-time cost is egress plus the engineering months to recreate IAM, networking, and any BigQuery workload. Map every service, estimate the egress, and model the commitments and migration labor in the calculator above before you commit.

Tooling & automation for this path

Use AWS MGN + DMS; rebuild IaC; sync GCS→S3; cut over via Route 53.

Primary references: official Amazon Web Services documentation ↗ and the Google Cloud documentation ↗ , always verify version-specific behavior against them before you migrate.

Frequently asked questions

What is the hardest GCP service to move to AWS?

BigQuery, by a wide margin. There is no drop-in equivalent: Redshift is a provisioned warehouse with a different cost and tuning model, and Athena over S3 is closer to BigQuery's serverless feel but makes you manage partitioning and file layout yourself. If your business runs on BigQuery, price that rebuild carefully, because it has quietly killed many otherwise sensible migrations.

Which tools move GCS objects and Cloud SQL databases into AWS?

For object data, AWS DataSync copies GCS to S3, and for very large or one-time loads a Snowball device can beat fighting bandwidth. For databases, AWS DMS runs continuous replication with minimal downtime, and its Schema Conversion Tool handles heterogeneous engine changes. Cloud SQL on PostgreSQL or MySQL maps to RDS on the same engine, which keeps the move clean.

Why can't I just port my GCP IAM and VPC configuration to AWS?

Because none of it migrates: you recreate it. GCP IAM bindings and service accounts become AWS IAM roles, policies, and instance profiles, and AWS leans on roles assumed by resources, so you re-architect rather than translate line by line. VPCs, subnets, routes, firewall rules, and load balancers are rebuilt in AWS primitives, ideally captured in Terraform so the new network is reviewable and repeatable.

How big can the egress bill get when leaving GCP?

Large enough to matter on its own. GCP meters egress per GB to pull your data out, so a multi-hundred-terabyte store can run a serious one-time bill just to leave. Estimate egress before you start, prune dead data first, and weigh physical transfer like Snowball for the biggest datasets. It never shows up in the steady-state comparison, but it is real cash on the way out.

Model your 3-year cost

Pre-filled for Google Cloud → Amazon Web Services; adjust every figure with your own numbers. Estimates are illustrative, not vendor quotes, see our methodology.

Sized at 200 cloud vCPUs, cost is computed on this.
Stay on Google Cloud (3yr)
$360,000
Move to Amazon Web Services (3yr + migration)
$456,000
Projected extra cost
$96,000 (27%)
Payback period
-
Build a decision report from these numbers:

How this is licensed: Cloud pricing is usage-based and highly variable. Cross-cloud savings come mainly from rightsizing, committed-use / reserved discounts, and avoiding egress, base on-demand compute rates are similar across hyperscalers. Set $/vCPU to your negotiated or committed rates (and add storage/egress) for an accurate comparison.

Illustrative, editable figures, not vendor pricing (defaults reviewed May 2026).

Request a vendor-accurate Amazon Web Services quote

A guided builder that turns your estimates into a requirements report (RFQ) you can send to a vendor, partner, or distributor for a binding quote, then feed the real prices back into the calculator above. How our estimates work.

  1. 1Size it
  2. 2Requirements
  3. 3Your details
  4. 4Channels & export

How big is your Google Cloud estate?

Count the OS/database server VMs and their typical vCPU allocation. Licensing usually counts all vCPUs on each VM. Not sure? Enter rough numbers, the distributor confirms exact counts later.

200 cloud vCPUs
Default mid-size assumption (200 cloud vCPUs)