3-year cost calculator
Pre-filled for Okta → Zitadel. Adjust every figure with your own numbers.
Every figure here is an illustrative estimate, not a vendor quote. Defaults are editable starting points compiled from public information; real, binding pricing comes from the vendor or an authorized distributor. See our methodology.
All figures are illustrative and fully editable — adjust the cost-per-user and migration inputs with your own numbers. Not guaranteed vendor pricing (defaults reviewed May 2026). For a binding quote, use the request form below to reach an authorized distributor or partner.
Quick comparison: Okta vs Zitadel
Common trade-offs teams weigh when staying on Okta versus moving to Zitadel. These are general, commonly-reported considerations — not statements of fact about any vendor — so check them against your own contract and the vendors' current terms.
- Already in production — no migration effort or risk
- Mature ecosystem with vendor support and SLAs
- Per-user pricing scales painfully with headcount
- Each capability (MFA, lifecycle, governance) is a separate SKU
- Annual contract uplifts
- Lock-in to Okta-specific integrations
- Ongoing per-user / month cost to budget for
- Higher vendor lock-in to weigh
- Open source — no license fees
- No vendor lock-in
- Cost model: Free OSS / Cloud
- Requires a migration (~18 weeks, high effort)
- Community support by default — paid support optional
- Higher operational learning curve
Why teams evaluate alternatives to Okta
Reasons commonly cited by users and in public industry coverage for re-evaluating Okta. These are general, reported considerations — not statements of fact about Okta — and may not reflect your situation or the vendor's current terms. Verify against your own contract before deciding.
- Per-user pricing scales painfully with headcount
- Each capability (MFA, lifecycle, governance) is a separate SKU
- Annual contract uplifts
- Lock-in to Okta-specific integrations
The migration plan
Roughly 18 weeks for a mid-size estate, in six phases.
Tooling & automation
Stand up Zitadel; import users and orgs; recreate OIDC/SAML apps; migrate MFA; cut over application by application.
OffVendor's wizard pre-fills these scripts with your environment — inventory export, disk/schema conversion, bulk provisioning, and validation.
Frequently asked
Is migrating from Okta to Zitadel worth it?
For most teams facing rising Okta costs, yes — Zitadel (free oss / cloud) typically lowers 3-year total cost of ownership, though the right answer depends on workload complexity and in-house skills. Use the calculator to model your own numbers.
How long does a Okta to Zitadel migration take?
A typical mid-size estimate is around 18 weeks across six phases — discovery, design, pilot, waved production migration, validation, and decommission. Larger or more complex estates take longer.
What tools are used to migrate from Okta to Zitadel?
Stand up Zitadel; import users and orgs; recreate OIDC/SAML apps; migrate MFA; cut over application by application.